04 January 2012

Day 90

If yesterday was frigid, I'm not sure what adjective could describe how cold it was today. Arctic? This crew would not be derailed by a little rough weather, though. They were out there first thing, before the temperatures got out of the teens. After modifying the front door and framing it out, they continued working on the front red siding. This was the most difficult siding installation so far, with lots of windows and the front door to manipulate the siding around.



Another long day!
The HVAC guys were back today. They put in some ducts in the downstairs bedrooms, and installed exhaust vents for the dryer, stove, and bathrooms. Forgot to check that out, though, so no pictures.

No comments:

Post a Comment