Brock got a lot of work done for a Saturday afternoon. The practice room windows and the top stairway window are now in, which means only the missing window is left to be installed.
Practice room windows |
Top window in stairwell now installed |
Before calling it a day, he installed the trim on the first window. It looks great, but he said it might need some modifying.
Finally, I found a sketch of the master bathroom that Mark had jotted down on the side of the bathtub box:
Master bath sketch |
No comments:
Post a Comment