17 December 2011

Day 80

Brock got a lot of work done for a Saturday afternoon. The practice room windows and the top stairway window are now in, which means only the missing window is left to be installed. 
Practice room windows

Top window in stairwell now installed
Before calling it a day, he installed the trim on the first window. It looks great, but he said it might need some modifying.


Finally, I found a sketch of the master bathroom that Mark had jotted down on the side of the bathtub box:
Master bath sketch