14 December 2011

Day 77

The windows are here! More on that in a moment. While Brock waited for the windows to arrive, he put in  the transition trim, which is a strip of metal between the roof and the exterior of the house that helps weather-seal the house from water that rolls down the siding. You can see it below on the right edge of the roof.
Transition trim
The window distributor arrived late this morning with the delivery. The windows are super-heavy, but Brock bought some suction cup handles -usually used for installing car windshields- which helped pick up the windows and hold them in place during the installation. Brock and Mark installed fourteen windows, and should be able to finish tomorrow.
First floor bedroom windows
Loft windows
First window installation



Kitchen window

No comments:

Post a Comment