15 November 2011

Day 64

Finally, the floor! After all this build-up, it's not that exciting to look at, but at least it's finished. The inspector came by and gave his approval on all three floors, so altogether it was a productive day.
insulating foam, vapor barrier, and re-bar
heating tubes (to be completed tomorrow) and plumbing rough-in
The tracked skid-steer turned out to be the right equipment for the job. Here's Mark using it to smooth out the driveway.
The concrete crew is not optimistic about the weather forecast for tomorrow, so they've already put off pouring the floors until Friday. Friday's forecast says sunny with a low of 36, so we'll keep our fingers crossed.

No comments:

Post a Comment