The concrete floor crew dropped by today. They dumped a load of rocks, parked a skid-steer, and called it a day. Pretty disappointing since we were expecting them to get to work on prepping the basement floor. But check back in over the weekend, because I'll probably have some kids-in-a-skid-steer pictures to post.
dump truck |
Brock and Mark cut foam and filled in holes around the first and second floors, so that when the cement is poured, it won't drip down in a cement fountain.
Good news about the floor tubing...it passed its pressure test, meaning there are no leaks.
Have a good weekend!
No comments:
Post a Comment