13 September 2011

Day 35

The second floor bolts are all tightened down, and the roof is now squared up with the cable bracing. It's difficult to see against the bright sky, but below is a picture of the cables on the roof:
Roof cables
Brock spent some time on the phone with Rigid discussing the replacement parts they'll be providing. They should ship by Thursday, so hopefully we'll have them by Monday.
Talking to Rigid on the phone. On the roof.

2 comments: