Today Mark finished securing the first floor with screws (that's 800+ screws just today), while Brock worked in the patching, modifying, and repairing department. As I mentioned yesterday, some of the purlins are the wrong size. Brock used a cutting wheel to cut some of the long ones to size; more problematic are those that are too short. A solution to that problem is yet to be determined.
Next up was repairing a spot where a purlin fell from the second story and mangled the floor in the front entryway. Below are some shots of the damage and the repair.
|
Before |
|
After |
Finally, Brock cut holes in the girts for the cable bracing, and then installed most of the cables. If you look closely, you'll see the cables running along the top:
|
Living room |