09 March 2012

Day 122

The drywall crew arrived this afternoon after lunch and was still working when we left late this afternoon. Meanwhile, Brock attached the metal roof to the front awning:



We talked to Mark and found out that the side door was the wrong size, and had to be sent back to the factory. That's two out of three. The corrected door is supposed to arrive by mid-week. 

The kitchen cabinets are scheduled to be delivered tomorrow. It's not the best timing to be receiving a large shipment, since the drywall isn't complete, but we'll make it work. 